UPS Building & Maintenance
All articles

Empty homes6 min read

Cutting void turnaround times: how landlords get empty homes relet faster

Every day a home sits empty costs rent and keeps a family on the waiting list. Here is where the days go, and how to win them back.

The UPS team

UPS Building & Maintenance, Skelmersdale

UPS decorator painting a wall in an empty home
UPS decorator painting a wall in an empty home. Photo: UPS Building & Maintenance.

Key takeaways

  • Key to key time is measured from the day the keys come back to the day a new tenancy starts.
  • Most lost days happen before or after the works: inspection, ordering, safety checks and sign off.
  • A clear lettable standard and a contractor with spare capacity stop voids from piling up.

Empty homes are one of the most visible costs for a social landlord. While a property is void it earns no rent, it can attract damage, and a household that needs a home keeps waiting. Turnaround time is the number boards and regulators watch, and it is usually lost in small delays rather than in the building work itself.

Where the days go

StageCommon delayWhat helps
Notice to keysNo inspection before the tenant leavesPre-termination visit to scope works early
Keys to startWaiting for a survey or an orderContractor surveys on the day the keys arrive
Safety checksGas, electrical and asbestos checks booked one after anotherBook checks in parallel at the start
WorksMissing materials, wrong tradesStandard specification and stocked materials
Sign offWaiting for an inspection slotPhoto evidence and a shared checklist
A general picture of void stages. Every landlord's process is different.

Set a clear lettable standard

A written empty homes standard tells everyone what a finished void looks like: what gets replaced, what gets repaired, what gets cleaned and decorated. Without one, each property becomes a negotiation, and that costs days. Contractors should work to your standard, not their own.

Separate minor and major voids

Most empty homes need repairs, safety checks, cleaning and decoration. A smaller number need a full refurbishment, such as a new kitchen, bathroom or wet room. Routing the two types differently keeps the quick ones quick, instead of letting them queue behind the big jobs.

Plan for peaks with overspill capacity

Void numbers rise and fall. An overspill arrangement with a second contractor means the extra homes start straight away instead of waiting for the main team. UPS runs a voids overspill contract for West Lancashire Borough Council for exactly this reason: to help reduce turnaround times and the rent loss that comes with them.

Track it

  • Measure each stage, not only the total, so you can see where days are lost.
  • Use photos at handover so sign off does not wait for a site visit.
  • Review repeat issues, such as the same item failing in several homes, and fix the cause.

How UPS helps

Our rapid response voids service covers everything from minor repairs to full house refurbishment, completed right first time to each client's empty homes standard. We currently deliver a 4 year voids contract for Magenta Living in Wirral.

Related service

Empty Homes

Fast void turnarounds, from minor repairs to full refurbishment, to cut rent loss and waiting lists.

Councils and housing associations

Need a contractor your residents will thank you for?

Adaptations, repairs, voids, planned works and extensions, delivered in-house from Skelmersdale and Manchester.

Are you a resident?

For a new repair or adaptation, please contact your landlord or council first. If UPS is already booked to work in your home, we are happy to help.

Ask about your booked work